Concrete Calculator: Cubic Metres and Premixed Bags
Last updated: · 4 min read
Knowing how many cubic metres of concrete a slab or column needs affects both cost and delivery planning. If you plan to use premixed bags, the next question is how many bags to buy. This guide works through a 5 m × 4 m slab poured 10 cm thick. It shows how the volume is found, why a 5% waste allowance is added, and why the yield of a bag depends on the brand.
Formula
Slab volume (m³) = length × width × thickness (cm) ÷ 100 Column volume (m³) = π × (diameter ÷ 2)² × height Total (m³) = volume × quantity × (1 + waste ÷ 100) Bags = rounded up (total m³ ÷ bag yield m³)
Slab thickness is entered in centimetres, so it is divided by 100 to convert to metres. The waste allowance covers spillage, uneven ground and cutting. The number of bags is always rounded up, because a part bag cannot be bought. The calculator assumes a yield of about 0.0117 m³ for a 25 kg bag and 0.6 ft³ (about 0.017 m³) for an 80 lb (36.3 kg) bag.
What the inputs mean
- Shape
- Slab or round column. Enter the measurements for the shape you choose; the others are not used.
- Length and width (slab)
- The dimensions of the area to be poured, in metres. A typical room floor is a few metres each way.
- Thickness (slab)
- Slab thickness in centimetres. For house floors, 10 cm is a common value.
- Diameter and height (column)
- The full diameter and height of a round column, in metres. Enter the full diameter, not the radius.
- Quantity
- How many identical elements are poured. Enter 1 for a single slab.
- Waste allowance (%)
- Loss and cutting allowance. 5% is typical for a level pour; 10% is common for complex shapes or mixing on site.
- Result to show
- Choose cubic metres, cubic feet, cubic yards, or the number of 25 kg or 80 lb bags.
Worked example: 5 m × 4 m slab, 10 cm thick, 5% waste
- Slab volume: 5 × 4 × 10 ÷ 100 = 2.00 m³.
- With waste: 2.00 × 1.05 = 2.10 m³.
- Cubic feet: 2.10 × 35.3147 = 74.16 ft³; cubic yards: 2.75 yd³.
- 25 kg bags: 2.10 ÷ 0.0117 ≈ 179.5 → 180 bags.
- 80 lb bags: 74.16 ÷ 0.6 ≈ 123.6 → 124 bags.
Result: The slab needs 2.10 m³ of concrete including waste. That is 180 bags of 25 kg or 124 bags of 80 lb. Because bag yield varies by brand, check the manufacturer's data sheet before ordering.
🧱 Concrete Calculator (Yards and Bags)
Free, no sign-up; your data stays in your browser.
Open the calculator →Also in this calculator
- Compare: up to three results side by side, with differences in amount and percent
- Chart: how the result moves when one value changes
- Solve backwards: type the result you want and find the value you need
- Download Excel: inputs, result and the table if there is one
- Save: keep the calculation in your own browser only
How to read the result
For small, scattered jobs, bagged concrete is practical, but its unit price is higher than ready-mixed concrete for larger volumes. When ordering, a slightly higher waste allowance and a re-check of measurements before pouring are good habits. These results are general information; a structural project needs engineering approval.
Country-specific note
The bag yield is based on the Quikrete Concrete Mix 1101 data sheet; other brands may give a different yield. The cubic feet, cubic yards and pound-based bag options follow US measurement units.
Common mistakes
- Entering thickness in metres instead of centimetres: treating 10 cm as 10 m makes the volume 100 times too large.
- Forgetting the waste allowance: spillage and cutting losses are often 5% to 10%, and a short order can leave a pour unfinished.
- Rounding bags down: 179.5 bags means 180, not 179, because part bags are not sold.
- Assuming every brand yields the same: the yield of a 25 kg bag varies by manufacturer, so check the packaging data.
- Using the diameter as the radius: the formula halves the diameter to get the radius; using the radius directly makes the volume four times too large.
Frequently asked questions
How many bags make 1 m³ of a 10 cm slab?
With the 25 kg bag yield used here, 1 m³ needs about 85 bags (1 ÷ 0.0117). This figure varies with the manufacturer's data.
When should I increase the waste allowance?
For uneven ground, a risk of formwork leaks, complex shapes or mixing on site, a 10% allowance instead of 5% is common.
Should I use ready-mixed or bagged concrete?
Ready-mixed concrete suits large pours; bagged concrete suits small or scattered jobs. As the volume grows, the cost of bags rises quickly.
Why should I also check the result against the bag yield?
The bag count converts volume into real packs. If the manufacturer's yield differs, the count changes, so always check the yield printed on the bag.
The result is not exact or binding and is for information only; it is not an official document and cannot be used in official procedures. Confirm it with the competent authority or a professional before acting; no liability is accepted for losses arising from its use.