Early Loan Repayment: Payoff Amount and Fee

Last updated: · 2 min read

When you close a loan early you pay the remaining principal, not the sum of the remaining instalments, because interest that has not accrued cannot be charged. On fixed-rate mortgages in Türkiye the bank may add a limited fee. The tool shows the payoff amount and the interest saved.

Formula

Payment = P × r ÷ (1 − (1 + r)^−n)
Remaining = P(1 + r)^o − T × ((1 + r)^o − 1) ÷ r
Payoff = remaining principal + fee

Under article 37 of Turkish Law No. 6502 the fee on fixed-rate mortgages cannot exceed 1% of the repaid principal if 36 months or less remain, and 2% otherwise; variable-rate loans have none. Other countries have their own rules.

What the inputs mean

Loan amount
The amount borrowed.
Monthly interest
The monthly interest rate.
Term
Total number of instalments.
Instalments paid
Instalments paid so far.
Type of loan
The fee applies to fixed-rate mortgages only.
Taxes added to interest
Taxes added to interest, 0 if none.

Worked example: 1,000,000 mortgage at 3% a month, 120 months, 24 paid

  1. Monthly payment: 30,889.92.
  2. Remaining principal: 969,363.28; with 96 months left the fee is at most 2%: 19,387.27.
  3. Payoff amount: 988,750.54; without closing you would pay 2,965,432.09.

Result: The loan closes with 988,750.54 and 1,976,681.54 of interest is avoided.

🔓 Early Loan Repayment Calculator

Free, no sign-up; your data stays in your browser.

Open the calculator →

Also in this calculator

  • Compare: up to three results side by side, with differences in amount and percent
  • Chart: how the result moves when one value changes
  • Solve backwards: type the result you want and find the value you need
  • Download Excel: inputs, result and the table if there is one
  • Save: keep the calculation in your own browser only

How to read the result

Closing early is not always best: if your money earns more after tax than the loan costs, keeping the loan can be better. Off-schedule closing adds a few days of interest.

Common mistakes

  • Adding up the remaining instalments.
  • Paying a fee on a variable-rate loan.
  • Forgetting accrued interest between due dates.

Frequently asked questions

Is there a fee on consumer loans?

Not in Türkiye; check the law of your own country.

Can I pay only part of it?

Yes, partial prepayment lowers the term or the instalment; tell the bank which one.

Does the result include other charges?

No, only principal and the legal fee.

The result is not exact or binding and is for information only; it is not an official document and cannot be used in official procedures. Confirm it with the competent authority or a professional before acting; no liability is accepted for losses arising from its use.

Sources

Choose your cookie preference to continue

Records the site needs to work (theme, language, favourites) stay in your browser.

This site is free and funded by ads.

With your consent, Google Analytics cookies measure visits and Google AdSense cookies are used to show ads; the data is processed on Google servers abroad.

If you reject, the site works just the same.

Cookie Policy · KVKK notice